Bidding Opportunities

We are currently accepting bids for all trades for projects in Arizona, California, and New Mexico. If you are interested in providing a bid, please contact the specific individual listed below.

If you need bid documents, contact Linda King, Estimating Assistant at (520) 571-0101, ext 115 (email: lking@tofeldent.com).

Download Subcontractor Pre-Qualification Form

La Quinta Inn & Suites – El Paso, TX

New construction of a 48,625 S.F., 4-story, 83 room hotel.  Construction to be stucco over wood frame on 5″ slab-on-grade, plus site work.

This project is located at 3470 Joe Battle Blvd., El Past, TX 79938

Anticipated start of this project is the 1st quarter of 2020.

Due Before 3:00 pm Wednesday, December 11, 2019
Lynn Catalfamo
Direct Line 520.571.0101 | lcatalfamo@tofeldent.com

Cano Drug/Hop Lee Laundry Rehab

New construction of a 3,192 SF theater, and rehab of an existing 3,733 SF building(s) for a club house, kitchen, new restrooms, and lease space to be located at Broadway Blvd. and Church Ave. in the center of the Flinn Apartments that are currently under construction.

New construction of the theater to be masonry walls with stucco, slab-on-grade with a wood roof system.  Rehab includes, but is not limited to: selective demolition; new concrete slabs; masonry and adobe infills; new finish coat of stucco at exterior; new metal stud framing and drywall in interior with drywall repairs; new plumbing, hvac, electrical systems, and fire sprinkler system.

Project Location: Broadway Blvd. & Church Ave., Tucson, AZ

Anticipated Start Date: January/Febuary, 2020.

Due Before 3:00 pm Thursday, November 21, 2019
Lynn Catalfamo
Direct Line 520.571.0101 | lcatalfamo@tofeldent.com

The Learning Experience Academy of Early Education

New construction of a 10,000 S.F. building to be located at Silverbell and Cortaro.  Construction shall be EIFS (owner has opted for an EIFS system in lieu of the siding) over wood frame on slab-on-grade, plus interior and site improvements in accordance with the prototype plans and specifications.

Construction is anticipated to start in the 3rd quarter of 2020.

This is NOT a prevailing wage project.

Due Before 2:00 pm Tuesday, November 19, 2019
Lynn Catalfamo
Direct Line 520.571.0101 | lcatalfamo@tofeldent.com
Becki Kitzman
bkitzman@tofeldent.com
520-571-0101